Home Twiki Page di Alessio Sarti
LHCb
Bsmumu
Full Simultaneous Fit
Unblinded fit in bsmumu/FitBs_sep12 under lhcbui2.
- Code is developed in FitSim.C (compiled macro)
- options
<verbatim>
-in // Decide among different MC input
-flag // Flagging output eps files
-range : fit in a range specified by name
-ntoy // Number of toys
-prior // Release some parameters adding a prior on them
-pmn // Add Pimunu
-ext // Perform and extended fit
-dopro // Profile study
-dotoy" // Perform toy study
-data // Number of toys
-eps // produce EPS
-maxbd // Number of toys
-maxbs // Number of toys
</verbatim>
Background Calibration
bkg fit developed by Flavio. Code under lhcbui2. Last version (with BUG from
RooNllVar) in
BkgFitDebug
Limit extraction
Page with detailed study on
FC implementation.
- Reobtain 2011 results.
- Check systematics
FIRST
SC
- SC time reso on GOLD
- protoni fuori da SC?
VTX simu
- we need to adjust the positioning of the sensors in the VTX since for now, in the simulation they are symmetrically placed around the center of the box (+/- 0.525cm from VTX enter), while in data I see that this is not true: (+0.5098,-0.4967)
- Fluka version/ number of pixels
BM
- Cell 2_1_1 --> Mostly Xtalk: checked on events with VTX and no target!
verifica t0, verifica segni
display ST
VTX - BM matching
check 1_0_1 :: 8mrad *105mm 0.84mm
Global Reconstruction
Aladin current hardcoded?
Software
- Finalized/checked the removal of dependencies from CTB and TAGmbs
SBAI
Test beams
Gsi Oct
--> carichi: correlare tracce con energia in lyso/BAF
--> short gate vs long gate
Gsi May
Development of the FIT
- Flux of charged particles (vs Ekin) --> With Michela
- Rise of the dist (FD + gaussian, left side)
- Flex of the dist (2G or spline, right side)
- Distance (total)
CNAO
Ilaria will follow up on that after exams.
DOSE profiler
Hough Transformation for tracking.
svn co svn+ssh://username@pcaen1.ing2.uniroma1.it/home/sarti/SvnRepos/DoseProfiler/ProfilerCode
Have to check with C and L where do we want to go for the paper.
PAPERWORK
- Medicina Occupazionale
- Verbali giugno/luglio
- Relazione annuale
Abilitazione
--
AlessioSarti - 2012-08-28