Tags:
create new tag
view all tags

GSI @ OCT

Aim

  1. Charged studies. Done using: 2 chmbs + scint @ 90 degrees. Real profile measured with TLD (1mm reso). 1 point to measure a 3D blob. Then finer studies. need to quantify the needed stat.
  2. Charged studies VS angle. Done using: 2 chmbs + scint @ 90 degrees.

When?

Beam time schedule

Starting from 12th October. Setting of cave takes ~ 2 days. Ends 16th October.

  • Everyone should leave th 10th of October
  • Someone should come back 15th Oct, someone after dismounting (18).

Tentative schedule

  1. 8-11 Mounting
  2. 11-13 Cave M setup
  3. 13-14 Beam time

Where

Cave M. (Medical).

Before 12 setting of the cave + quality check of the beam.

Mechanics

Rec with wheels. (dismounting)

Table + arms to hold detectors.

  1. One start counter BEFORE the phantom.
  2. One arm should move in theta: New BM + LYso
  3. One arm is on top of phantom: old chmb + BaF (or other fast scintillator)
  4. One arm is fixed @ 90 degrees (collimator, BaF, veto)

Hardware

Gas system

Already @ GSI

  • Gas system.
  • Gas bottle (premixed 82/18 Ar Co2)
Chambers fluxed in series.

Detectors

Already @ GSI

  • 2mm Start counter or Daisy!
  • New Chmb
  • 1 (or 2) BaF scintillators
  • Collimator?
  • Veto?
To be brought from Roma1
  • Old Chamber+ cables.
  • New Start Counter read with two H10580 PMT, SC thickness: plexiglass 1,8 mm :: Aluminum foil 0,05 mm :: Black tape 0,25 mm
  • Lyso

Power supply

Already @ GSI

  • LV power supply: 4 channels. (for the two chambers)
To be brought from Roma1
  • HV: any other needed channel.
  • HV: 4 channels. [3 channels for the two chambers.]
Channels:
  • HV:
    • 3chs (New and OLd chmb)
    • 2chs (BaF)
    • 2chs HV
    • 1ch Start Counter GSI
    • 1ch veto
  • LV:
    • 4 channels (2 chambers)
    • 2 channels (Daisy)

Electronics

Already @ GSI

  • Crate Nim (ex FIRST trigger)
  • Crate VME
  • Scope (?)
  • Crate Camac (?)
To be brought from Roma1
  • Crate Camac
  • Crate Nim
NIM Modules
  • Most of them are @ GSI: nim/ecl translators, discriminators....
  • Nim/TTL translator (GSI)
VME Modules
  • 3 QDC modules: 2 Roma1, 1 GSI
  • 2 TDC modules: 1190 + ? KLOE TDCs? GSI TDC?
  • I/O
  • Scaler
Delay modules?

Cables

  • 40 Lemo Cables (GSI)

DAQ

  • Signal from TPS for Energy switch?
  • Bridged ACQ.

ELOG

The elog of the TB can be found here

Software

@ CT : 30 min, 300 evt, 600 mum precision with 17*10^8 particles.

Acquisition

Being developed on workstation2. Project is under svn.

svn co svn+ssh://<youraccount>@pcaen1.ing2.uniroma1.it/home/sarti/SvnRepos/TestBeamCode/GsiOct_2011_Bridge

Decoding

Being developed on workstation2. Project is under svn.

svn co svn+ssh://<youraccount>@pcaen1.ing2.uniroma1.it/home/sarti/SvnRepos/TestBeamCode/GsiOct_2011_BridgeDecode

Configuration

As of 13 Oct 2011 @ 15:00.

QDC

  1. QDC 1 (Baf): Gate 500ns, Ch0 --> SC, Ch1 --> Palettino, Ch2 --> LYSO1, Ch3 --> LYSO2
  2. QDC 0 (Baf1, Ex Multianode): Multianode 8 Ch (0,1 & 4-15) from P1, 58, 34, 26, 18, 10, 59, 51, 43, 35, 27, 19, 11, 3 Delayed by 8-900 ns. Ch2,3 delayed by 300ns (P50, P42).
  3. QDC 2 (Bad2): Empty
TDC
  1. TDC 64 ch:
  2. TDC 16 ch: 0--7 New Chmb. Ch 12 (sync signal). Ch 13: or of triggers.

Strategy

Calibration of detectors

  • Lyso: should we calibrate?
  • BM: how much time do we need to have ST relations? Look at BTF.... to see if we can use the old ST without new calibration
-- AlessioSarti - 2011-09-20

Edit | Attach | Watch | Print version | History: r12 < r11 < r10 < r9 < r8 | Backlinks | Raw View | Raw edit | More topic actions
Topic revision: r12 - 2012-05-07 - AlessioSarti
 
This site is powered by the TWiki collaboration platform Powered by PerlCopyright © 2008-2024 by the contributing authors. All material on this collaboration platform is the property of the contributing authors.
Ideas, requests, problems regarding TWiki? Send feedback