Difference: CNAOFeb2012 (1 vs. 9)

Revision 92015-07-23 - TWikiAdminUser

 

CNAO @ Jul 2012


Aim

  • Redo the Catania/GSI measurements on proton beam on PMMA target.
  • Several angles have to be tested: 90 deg, 60 deg, 75 deg
Beam structure. Spill to Spill 3-4 seconds. Spill lasts for 1 second. We are going to study that with the scope

Beam Energy: Computed by simulations (table from G. Battistoni is available)

When?

July 20 - 22 .

  • July 20: mounting + first minutes of beam + calibration with source
  • July 21: 4 hours of beams... found that the SC are not behaving properly
  • July 21-22 night: 8 hours of datataking. First hourse devoted to SC replacement, then few hours at different angles/depths/energies.
Calibrations:
  • Lyso0 and Lyso1 have been calibrated with Co60 and Eu152
  • t0s for the chambers can be obtained by all the runs together....

Where?

Hall 1. Control room 3m out of corridoio.

GAS

Ar/CO2

  • We need to bring the premixed bottle
  • Exhaust is ok.

Mechanics

  • Rec for electronics? Arrived/mounted... We will bring it.
  • Needs to finalize the choice for the mechanical structure (we need to check how it goes with the angles study)
Changed:
<
<
  • Need to know:
>
>
  • Need to know:
 
    1. beam height
Final setup (Catania like):
  1. Lyso + collim
  2. Two Nai at 180 degrees
  3. New Beam Monitor

Hardware

  • New Beam monitor
  • 2 NaI detectors.
  • Collimator (slit)
  • 2 LYSO
  • Start Counter [we already have it]
  • Palettino before New Beam Monitor?

ELOG

Changed:
<
<
The elog
>
>
The elog
 

Night btw 21/22 july.

  • Run: data/MainRun_2107_113mm_run1.dat : verify the impact of changes during the afternoon. A channel from drift chamber is recovered. SC continues to give troubles. Proceed at really low rate (100 Hz daq). Access at 23:40
  • Run: data/MainRun_2107_123mm_run2.dat : SC continues to give problems. But now rate is higher. Run 2 is taken at 132.72 MeV (123 mm) (113_run2 is a typo)
  • 2:14: intensity is higer, now the transmitted intensity is 50% (before was 20).
Changed:
<
<
  • MainRun_2107_123mm_run4 --> rate osservata e' 1kHz… --> 321k events collected (Si e' spostato di 0.5mm in x positive…. banana plot seems to be worse (dirtier).)
>
>
  • MainRun _2107_123mm_run4 --> rate osservata e' 1kHz… --> 321k events collected (Si e' spostato di 0.5mm in x positive…. banana plot seems to be worse (dirtier).)
 
  • Going back to *20 intensity (ridurre intensita'), we go @ 125mm run5
Changed:
<
<
  • MainRun_2107_125mm_run5 started @ 2:49
  • MainRun_2107_121mm_run6 started @ 3:39
  • MainRun_2107_129mm_run7 started @ 4:25
  • MainRun_2107_117mm_run8 started @ 5:15
>
>
  • MainRun _2107_125mm_run5 started @ 2:49
  • MainRun _2107_121mm_run6 started @ 3:39
  • MainRun _2107_129mm_run7 started @ 4:25
  • MainRun _2107_117mm_run8 started @ 5:15
 
  • Si entra per rimetterci a 90deg

DAQ

Checked that we can bring our WS1 for daq. There will be an ethernet connection from control room to hall: private network to connect to the WS1, and then we have a wireless to connect to outside. We will use a bridge for the acquisition (either usb or fiber).

DAQ config

  • TDC multihit ch 0-35: 36 tdc times from beam monitor
  • tdc and adc for the NaIs
  • Signals from machine?
  • RF or monitoring of position/energy
-- AlessioSarti - 2011-11-16

META FILEATTACHMENT attachment="SKMBT_C36011101011350.pdf" attr="" comment="Sketch of halls and control rooms" date="1321458961" name="SKMBT_C36011101011350.pdf" path="SKMBT_C36011101011350.pdf" size="399519" user="AlessioSarti" version="1"
META FILEATTACHMENT attachment="isocentro1.pdf" attr="" comment="Sketch of halls and control rooms" date="1321458951" name="isocentro1.pdf" path="isocentro1.pdf" size="16118" user="AlessioSarti" version="1"
META FILEATTACHMENT attachment="sezione.pdf" attr="" comment="Sketch of halls and control rooms" date="1321458951" name="sezione.pdf" path="sezione.pdf" size="24753" user="AlessioSarti" version="1"

Revision 82012-08-01 - AlessioSarti

 

CNAO @ Jul 2012


Aim

Changed:
<
<
  • Target? PMMA
  • Particle rates? Up to GHz. We are going to need ~ 1 MHz. Seems to be feasible: degrader can be added and we are also building a collimator.
>
>
  • Redo the Catania/GSI measurements on proton beam on PMMA target.
  • Several angles have to be tested: 90 deg, 60 deg, 75 deg
 Beam structure. Spill to Spill 3-4 seconds. Spill lasts for 1 second. We are going to study that with the scope
Changed:
<
<
Beam Energy: need of a too long PMMA ... now we have 10-22 cm... Beam Spot 0.9 -- 1.1 cm...
>
>
Beam Energy: Computed by simulations (table from G. Battistoni is available)
 
Changed:
<
<
TPS that have to be prepared.
>
>

When?

Deleted:
<
<
  1. STILL a DRAFT
  2. First night: Take 1 PMMA cylinder and I see what happens varying the angle.Publish fluxes of protons from PMMA. I want to give 1 Gy (treatment like).
Measurements:
  1. We are going to redo Catania: different energies and different angles.

When? [Draft for time plan]

 
Changed:
<
<
Februrary 9 -12 ... For 2 nights.... (16 hours).
  • Thursday (9/2) we star, but friday morning we go back to stealth [patient being treated]: during the night we try to calibrate everything!
    1. With Radioactive sources we calibrate LYSOs and NAIs, with beam (if possible) we calibrate the Beam Monitor
  • Friday we install everything on the final geometry.
  • Saturday and Sunday we take data
Calibrations: when?
  • Detectors should be already calibrated, we measure a reference point on the final setup on thursday night.
>
>
July 20 - 22 .
  • July 20: mounting + first minutes of beam + calibration with source
  • July 21: 4 hours of beams... found that the SC are not behaving properly
  • July 21-22 night: 8 hours of datataking. First hourse devoted to SC replacement, then few hours at different angles/depths/energies.
Calibrations:
  • Lyso0 and Lyso1 have been calibrated with Co60 and Eu152
  • t0s for the chambers can be obtained by all the runs together....
Deleted:
<
<
  • Thursday night we need (beam) time to
    1. Acquire t0s for BM
    2. check that ST relations are fine
    3. Calibrate NaI?
    4. Calibrate LYSO?
 

Where?

Changed:
<
<
Hall 1. Control room 3m out of corridoio (needed to check cables lenght).
>
>
Hall 1. Control room 3m out of corridoio.
 
Changed:
<
<
  • Long Cables can exit from experimental hall: to be checked as a function of cable thickness.
>
>
  • Patch Panel available to read signals in control room..
Deleted:
<
<
  • There are several IN<->OUT from hall to control room: a complete list of signals that we want outside should be made and Xcheked with available connections
 
Deleted:
<
<
 
Deleted:
<
<
 

GAS

Ar/CO2

  • We need to bring the premixed bottle
  • Exhaust is ok.

Mechanics

  • Rec for electronics? Arrived/mounted... We will bring it.
  • Needs to finalize the choice for the mechanical structure (we need to check how it goes with the angles study)
  • Need to know:
    1. beam height
Final setup (Catania like):
  1. Lyso + collim
  2. Two Nai at 180 degrees
  3. New Beam Monitor

Hardware

  • New Beam monitor
  • 2 NaI detectors.
  • Collimator (slit)
  • 2 LYSO
  • Start Counter [we already have it]
  • Palettino before New Beam Monitor?

ELOG

The elog

Added:
>
>

Night btw 21/22 july.

  • Run: data/MainRun_2107_113mm_run1.dat : verify the impact of changes during the afternoon. A channel from drift chamber is recovered. SC continues to give troubles. Proceed at really low rate (100 Hz daq). Access at 23:40
  • Run: data/MainRun_2107_123mm_run2.dat : SC continues to give problems. But now rate is higher. Run 2 is taken at 132.72 MeV (123 mm) (113_run2 is a typo)
  • 2:14: intensity is higer, now the transmitted intensity is 50% (before was 20).
  • MainRun_2107_123mm_run4 --> rate osservata e' 1kHz… --> 321k events collected (Si e' spostato di 0.5mm in x positive…. banana plot seems to be worse (dirtier).)
  • Going back to *20 intensity (ridurre intensita'), we go @ 125mm run5
  • MainRun_2107_125mm_run5 started @ 2:49
  • MainRun_2107_121mm_run6 started @ 3:39
  • MainRun_2107_129mm_run7 started @ 4:25
  • MainRun_2107_117mm_run8 started @ 5:15
  • Si entra per rimetterci a 90deg
 

DAQ

Checked that we can bring our WS1 for daq. There will be an ethernet connection from control room to hall: private network to connect to the WS1, and then we have a wireless to connect to outside. We will use a bridge for the acquisition (either usb or fiber).

Changed:
<
<

signals we would like to acquire

  • 36 tdc times from beam monitor
>
>

DAQ config

  • TDC multihit ch 0-35: 36 tdc times from beam monitor
 
  • tdc and adc for the NaIs
  • Signals from machine?
  • RF or monitoring of position/energy
-- AlessioSarti - 2011-11-16

META FILEATTACHMENT attachment="SKMBT_C36011101011350.pdf" attr="" comment="Sketch of halls and control rooms" date="1321458961" name="SKMBT_C36011101011350.pdf" path="SKMBT_C36011101011350.pdf" size="399519" user="AlessioSarti" version="1"
META FILEATTACHMENT attachment="isocentro1.pdf" attr="" comment="Sketch of halls and control rooms" date="1321458951" name="isocentro1.pdf" path="isocentro1.pdf" size="16118" user="AlessioSarti" version="1"
META FILEATTACHMENT attachment="sezione.pdf" attr="" comment="Sketch of halls and control rooms" date="1321458951" name="sezione.pdf" path="sezione.pdf" size="24753" user="AlessioSarti" version="1"

Revision 72012-07-30 - AlessioSarti

Changed:
<
<

CNAO @ Feb 2012

>
>

CNAO @ Jul 2012

 

Aim

  • Target? PMMA
  • Particle rates? Up to GHz. We are going to need ~ 1 MHz. Seems to be feasible: degrader can be added and we are also building a collimator.
Beam structure. Spill to Spill 3-4 seconds. Spill lasts for 1 second. We are going to study that with the scope

Beam Energy: need of a too long PMMA ... now we have 10-22 cm... Beam Spot 0.9 -- 1.1 cm...

TPS that have to be prepared.

  1. STILL a DRAFT
  2. First night: Take 1 PMMA cylinder and I see what happens varying the angle.Publish fluxes of protons from PMMA. I want to give 1 Gy (treatment like).
Measurements:
  1. We are going to redo Catania: different energies and different angles.

When? [Draft for time plan]

Februrary 9 -12 ... For 2 nights.... (16 hours).

  • Thursday (9/2) we star, but friday morning we go back to stealth [patient being treated]: during the night we try to calibrate everything!
    1. With Radioactive sources we calibrate LYSOs and NAIs, with beam (if possible) we calibrate the Beam Monitor
  • Friday we install everything on the final geometry.
  • Saturday and Sunday we take data
Calibrations: when?
  • Detectors should be already calibrated, we measure a reference point on the final setup on thursday night.
  • Thursday night we need (beam) time to
    1. Acquire t0s for BM
    2. check that ST relations are fine
    3. Calibrate NaI?
    4. Calibrate LYSO?

Where?

Hall 1. Control room 3m out of corridoio (needed to check cables lenght).

  • Long Cables can exit from experimental hall: to be checked as a function of cable thickness.
  • There are several IN<->OUT from hall to control room: a complete list of signals that we want outside should be made and Xcheked with available connections

GAS

Ar/CO2

  • We need to bring the premixed bottle
  • Exhaust is ok.

Mechanics

  • Rec for electronics? Arrived/mounted... We will bring it.
  • Needs to finalize the choice for the mechanical structure (we need to check how it goes with the angles study)
  • Need to know:
    1. beam height
Final setup (Catania like):
  1. Lyso + collim
  2. Two Nai at 180 degrees
  3. New Beam Monitor

Hardware

  • New Beam monitor
  • 2 NaI detectors.
  • Collimator (slit)
  • 2 LYSO
  • Start Counter [we already have it]
  • Palettino before New Beam Monitor?
Added:
>
>

ELOG

The elog

 

DAQ

Checked that we can bring our WS1 for daq. There will be an ethernet connection from control room to hall: private network to connect to the WS1, and then we have a wireless to connect to outside. We will use a bridge for the acquisition (either usb or fiber).

signals we would like to acquire

  • 36 tdc times from beam monitor
  • tdc and adc for the NaIs
  • Signals from machine?
  • RF or monitoring of position/energy
-- AlessioSarti - 2011-11-16

META FILEATTACHMENT attachment="SKMBT_C36011101011350.pdf" attr="" comment="Sketch of halls and control rooms" date="1321458961" name="SKMBT_C36011101011350.pdf" path="SKMBT_C36011101011350.pdf" size="399519" user="AlessioSarti" version="1"
META FILEATTACHMENT attachment="isocentro1.pdf" attr="" comment="Sketch of halls and control rooms" date="1321458951" name="isocentro1.pdf" path="isocentro1.pdf" size="16118" user="AlessioSarti" version="1"
META FILEATTACHMENT attachment="sezione.pdf" attr="" comment="Sketch of halls and control rooms" date="1321458951" name="sezione.pdf" path="sezione.pdf" size="24753" user="AlessioSarti" version="1"

Revision 62012-01-20 - AlessioSarti

 

CNAO @ Feb 2012


Aim

  • Target? PMMA
  • Particle rates? Up to GHz. We are going to need ~ 1 MHz. Seems to be feasible: degrader can be added and we are also building a collimator.
Beam structure. Spill to Spill 3-4 seconds. Spill lasts for 1 second. We are going to study that with the scope

Beam Energy: need of a too long PMMA ... now we have 10-22 cm... Beam Spot 0.9 -- 1.1 cm...

TPS that have to be prepared.

  1. STILL a DRAFT
  2. First night: Take 1 PMMA cylinder and I see what happens varying the angle.Publish fluxes of protons from PMMA. I want to give 1 Gy (treatment like).
Measurements:
  1. We are going to redo Catania: different energies and different angles.

When? [Draft for time plan]

Februrary 9 -12 ... For 2 nights.... (16 hours).

  • Thursday (9/2) we star, but friday morning we go back to stealth [patient being treated]: during the night we try to calibrate everything!
    1. With Radioactive sources we calibrate LYSOs and NAIs, with beam (if possible) we calibrate the Beam Monitor
  • Friday we install everything on the final geometry.
  • Saturday and Sunday we take data
Calibrations: when?
  • Detectors should be already calibrated, we measure a reference point on the final setup on thursday night.
  • Thursday night we need (beam) time to
    1. Acquire t0s for BM
    2. check that ST relations are fine
    3. Calibrate NaI?
    4. Calibrate LYSO?

Where?

Hall 1. Control room 3m out of corridoio (needed to check cables lenght).

  • Long Cables can exit from experimental hall: to be checked as a function of cable thickness.
  • There are several IN<->OUT from hall to control room: a complete list of signals that we want outside should be made and Xcheked with available connections

GAS

Ar/CO2

  • We need to bring the premixed bottle
  • Exhaust is ok.

Mechanics

  • Rec for electronics? Arrived/mounted... We will bring it.
  • Needs to finalize the choice for the mechanical structure (we need to check how it goes with the angles study)
Added:
>
>
  • Need to know:
    1. beam height
 Final setup (Catania like):
  1. Lyso + collim
  2. Two Nai at 180 degrees
  3. New Beam Monitor

Hardware

  • New Beam monitor
  • 2 NaI detectors.
  • Collimator (slit)
  • 2 LYSO
  • Start Counter [we already have it]
  • Palettino before New Beam Monitor?

DAQ

Checked that we can bring our WS1 for daq. There will be an ethernet connection from control room to hall: private network to connect to the WS1, and then we have a wireless to connect to outside. We will use a bridge for the acquisition (either usb or fiber).

signals we would like to acquire

  • 36 tdc times from beam monitor
  • tdc and adc for the NaIs
  • Signals from machine?
  • RF or monitoring of position/energy
-- AlessioSarti - 2011-11-16

META FILEATTACHMENT attachment="SKMBT_C36011101011350.pdf" attr="" comment="Sketch of halls and control rooms" date="1321458961" name="SKMBT_C36011101011350.pdf" path="SKMBT_C36011101011350.pdf" size="399519" user="AlessioSarti" version="1"
META FILEATTACHMENT attachment="isocentro1.pdf" attr="" comment="Sketch of halls and control rooms" date="1321458951" name="isocentro1.pdf" path="isocentro1.pdf" size="16118" user="AlessioSarti" version="1"
META FILEATTACHMENT attachment="sezione.pdf" attr="" comment="Sketch of halls and control rooms" date="1321458951" name="sezione.pdf" path="sezione.pdf" size="24753" user="AlessioSarti" version="1"

Revision 52012-01-20 - AlessioSarti

 

CNAO @ Feb 2012


Aim

  • Target? PMMA
  • Particle rates? Up to GHz. We are going to need ~ 1 MHz. Seems to be feasible: degrader can be added and we are also building a collimator.
Beam structure. Spill to Spill 3-4 seconds. Spill lasts for 1 second. We are going to study that with the scope

Beam Energy: need of a too long PMMA ... now we have 10-22 cm... Beam Spot 0.9 -- 1.1 cm...

TPS that have to be prepared.

  1. STILL a DRAFT
  2. First night: Take 1 PMMA cylinder and I see what happens varying the angle.Publish fluxes of protons from PMMA. I want to give 1 Gy (treatment like).
Measurements:
  1. We are going to redo Catania: different energies and different angles.

When? [Draft for time plan]

Februrary 9 -12 ... For 2 nights.... (16 hours).

Changed:
<
<
  • Thursday (9/2) we star, but friday morning we go back to stealth [patient being treated]: during the night we try to calibrate everything!
>
>
  • Thursday (9/2) we star, but friday morning we go back to stealth [patient being treated]: during the night we try to calibrate everything!
 
    1. With Radioactive sources we calibrate LYSOs and NAIs, with beam (if possible) we calibrate the Beam Monitor
  • Friday we install everything on the final geometry.
  • Saturday and Sunday we take data
Calibrations: when?
  • Detectors should be already calibrated, we measure a reference point on the final setup on thursday night.
  • Thursday night we need (beam) time to
    1. Acquire t0s for BM
    2. check that ST relations are fine
    3. Calibrate NaI?
    4. Calibrate LYSO?

Where?

Hall 1. Control room 3m out of corridoio (needed to check cables lenght).

  • Long Cables can exit from experimental hall: to be checked as a function of cable thickness.
  • There are several IN<->OUT from hall to control room: a complete list of signals that we want outside should be made and Xcheked with available connections

GAS

Changed:
<
<
Ar/CO2: it is ok? [needed for both chambers]
  • We need to bring the premixed bottle
  • Currently checking exhaust problems
>
>
Ar/CO2
  • We need to bring the premixed bottle
  • Exhaust is ok.
 

Mechanics

  • Rec for electronics? Arrived/mounted... We will bring it.
  • Needs to finalize the choice for the mechanical structure (we need to check how it goes with the angles study)
Final setup (Catania like):
  1. Lyso + collim
  2. Two Nai at 180 degrees
  3. New Beam Monitor

Hardware

  • New Beam monitor
  • 2 NaI detectors.
  • Collimator (slit)
  • 2 LYSO
  • Start Counter [we already have it]
  • Palettino before New Beam Monitor?

DAQ

Checked that we can bring our WS1 for daq. There will be an ethernet connection from control room to hall: private network to connect to the WS1, and then we have a wireless to connect to outside. We will use a bridge for the acquisition (either usb or fiber).

signals we would like to acquire

  • 36 tdc times from beam monitor
  • tdc and adc for the NaIs
  • Signals from machine?
  • RF or monitoring of position/energy
-- AlessioSarti - 2011-11-16

META FILEATTACHMENT attachment="SKMBT_C36011101011350.pdf" attr="" comment="Sketch of halls and control rooms" date="1321458961" name="SKMBT_C36011101011350.pdf" path="SKMBT_C36011101011350.pdf" size="399519" user="AlessioSarti" version="1"
META FILEATTACHMENT attachment="isocentro1.pdf" attr="" comment="Sketch of halls and control rooms" date="1321458951" name="isocentro1.pdf" path="isocentro1.pdf" size="16118" user="AlessioSarti" version="1"
META FILEATTACHMENT attachment="sezione.pdf" attr="" comment="Sketch of halls and control rooms" date="1321458951" name="sezione.pdf" path="sezione.pdf" size="24753" user="AlessioSarti" version="1"

Revision 42012-01-20 - AlessioSarti

 

CNAO @ Feb 2012


Aim

  • Target? PMMA
Changed:
<
<
  • Particle rates? Up to GHz. We are going to need ~ 1 MHz.
Beam structure. Spill to Spill 3-4 seconds. Spill lasts for 1 second.
>
>
  • Particle rates? Up to GHz. We are going to need ~ 1 MHz. Seems to be feasible: degrader can be added and we are also building a collimator.
Beam structure. Spill to Spill 3-4 seconds. Spill lasts for 1 second. We are going to study that with the scope
  Beam Energy: need of a too long PMMA ... now we have 10-22 cm... Beam Spot 0.9 -- 1.1 cm...
Changed:
<
<
TPS?
>
>
TPS that have to be prepared.
Added:
>
>
  1. STILL a DRAFT
 
  1. First night: Take 1 PMMA cylinder and I see what happens varying the angle.Publish fluxes of protons from PMMA. I want to give 1 Gy (treatment like).
Measurements:
  1. We are going to redo Catania: different energies and different angles.
Changed:
<
<

When?

>
>

When? [Draft for time plan]

  Februrary 9 -12 ... For 2 nights.... (16 hours).
Changed:
<
<
  • Thursday (9/2) we start
  • Friday we install
  • Saturday and Sunday we take data (night)
>
>
  • Thursday (9/2) we star, but friday morning we go back to stealth [patient being treated]: during the night we try to calibrate everything!
    1. With Radioactive sources we calibrate LYSOs and NAIs, with beam (if possible) we calibrate the Beam Monitor
  • Friday we install everything on the final geometry.
Added:
>
>
  • Saturday and Sunday we take data
 Calibrations: when?
Changed:
<
<
  • Detectors should be already calibrated.
  • We need time to
>
>
  • Detectors should be already calibrated, we measure a reference point on the final setup on thursday night.
  • Thursday night we need (beam) time to
 
    1. Acquire t0s for BM
    2. check that ST relations are fine
    3. Calibrate NaI?
    4. Calibrate LYSO?

Where?

Hall 1. Control room 3m out of corridoio (needed to check cables lenght).

Changed:
<
<
  • Cables can exit from experimental hall: to be checked as a function of cable thickness.
>
>
  • Long Cables can exit from experimental hall: to be checked as a function of cable thickness.
Added:
>
>
  • There are several IN<->OUT from hall to control room: a complete list of signals that we want outside should be made and Xcheked with available connections
 

GAS

Ar/CO2: it is ok? [needed for both chambers]

Changed:
<
<
  • We need to bring the bottle
  • Cables can exit from experimental hall
>
>
  • We need to bring the premixed bottle
  • Currently checking exhaust problems
 

Mechanics

Changed:
<
<
  • Rec for electronics?
  • Height from floor: 1.2 m. Are there tables?
>
>
  • Rec for electronics? Arrived/mounted... We will bring it.
  • Needs to finalize the choice for the mechanical structure (we need to check how it goes with the angles study)
Added:
>
>
Final setup (Catania like):
 
  1. Lyso + collim
  2. Two Nai at 180 degrees
  3. New Beam Monitor

Hardware

  • New Beam monitor
  • 2 NaI detectors.
Added:
>
>
  • Collimator (slit)
  • 2 LYSO
  • Start Counter [we already have it]
  • Palettino before New Beam Monitor?
 

DAQ

Added:
>
>
Checked that we can bring our WS1 for daq. There will be an ethernet connection from control room to hall: private network to connect to the WS1, and then we have a wireless to connect to outside. We will use a bridge for the acquisition (either usb or fiber).

signals we would like to acquire

  • 36 tdc times from beam monitor
  • tdc and adc for the NaIs
 
  • Signals from machine?
  • RF or monitoring of position/energy
-- AlessioSarti - 2011-11-16

META FILEATTACHMENT attachment="SKMBT_C36011101011350.pdf" attr="" comment="Sketch of halls and control rooms" date="1321458961" name="SKMBT_C36011101011350.pdf" path="SKMBT_C36011101011350.pdf" size="399519" user="AlessioSarti" version="1"
META FILEATTACHMENT attachment="isocentro1.pdf" attr="" comment="Sketch of halls and control rooms" date="1321458951" name="isocentro1.pdf" path="isocentro1.pdf" size="16118" user="AlessioSarti" version="1"
META FILEATTACHMENT attachment="sezione.pdf" attr="" comment="Sketch of halls and control rooms" date="1321458951" name="sezione.pdf" path="sezione.pdf" size="24753" user="AlessioSarti" version="1"

Revision 32012-01-20 - AlessioSarti

 

CNAO @ Feb 2012


Aim

  • Target? PMMA
  • Particle rates? Up to GHz. We are going to need ~ 1 MHz.
Beam structure. Spill to Spill 3-4 seconds. Spill lasts for 1 second.

Beam Energy: need of a too long PMMA ... now we have 10-22 cm... Beam Spot 0.9 -- 1.1 cm...

TPS?

  1. First night: Take 1 PMMA cylinder and I see what happens varying the angle.Publish fluxes of protons from PMMA. I want to give 1 Gy (treatment like).
Deleted:
<
<
  1. Second night: Use a human link phantom.
 Measurements:
  1. We are going to redo Catania: different energies and different angles.

When?

Februrary 9 -12 ... For 2 nights.... (16 hours).

  • Thursday (9/2) we start
  • Friday we install
  • Saturday and Sunday we take data (night)
Calibrations: when?
  • Detectors should be already calibrated.
Changed:
<
<
  • We need time to
>
>
  • We need time to
 
    1. Acquire t0s for BM
    2. check that ST relations are fine
    3. Calibrate NaI?
    4. Calibrate LYSO?

Where?

Hall 1. Control room 3m out of corridoio (needed to check cables lenght).

  • Cables can exit from experimental hall: to be checked as a function of cable thickness.

GAS

Ar/CO2: it is ok? [needed for both chambers]

  • We need to bring the bottle
  • Cables can exit from experimental hall

Mechanics

  • Rec for electronics?
  • Height from floor: 1.2 m. Are there tables?
  1. Lyso + collim
  2. Two Nai at 180 degrees
  3. New Beam Monitor

Hardware

  • New Beam monitor
  • 2 NaI detectors.

DAQ

  • Signals from machine?
  • RF or monitoring of position/energy
-- AlessioSarti - 2011-11-16

META FILEATTACHMENT attachment="SKMBT_C36011101011350.pdf" attr="" comment="Sketch of halls and control rooms" date="1321458961" name="SKMBT_C36011101011350.pdf" path="SKMBT_C36011101011350.pdf" size="399519" user="AlessioSarti" version="1"
META FILEATTACHMENT attachment="isocentro1.pdf" attr="" comment="Sketch of halls and control rooms" date="1321458951" name="isocentro1.pdf" path="isocentro1.pdf" size="16118" user="AlessioSarti" version="1"
META FILEATTACHMENT attachment="sezione.pdf" attr="" comment="Sketch of halls and control rooms" date="1321458951" name="sezione.pdf" path="sezione.pdf" size="24753" user="AlessioSarti" version="1"

Revision 22012-01-13 - AlessioSarti

 

CNAO @ Feb 2012


Aim

Changed:
<
<
Target? PMMA (solid water) or Human like phantom?
>
>
  • Target? PMMA
  • Particle rates? Up to GHz. We are going to need ~ 1 MHz.
Deleted:
<
<
Particle rates? Up to GHz. We are going to need ~ 1 MHz.
 Beam structure. Spill to Spill 3-4 seconds. Spill lasts for 1 second.

Beam Energy: need of a too long PMMA ... now we have 10-22 cm... Beam Spot 0.9 -- 1.1 cm...

TPS?

Deleted:
<
<
 
  1. First night: Take 1 PMMA cylinder and I see what happens varying the angle.Publish fluxes of protons from PMMA. I want to give 1 Gy (treatment like).
  2. Second night: Use a human link phantom.
Added:
>
>
Measurements:
  1. We are going to redo Catania: different energies and different angles.
 

When?

Februrary 9 -12 ... For 2 nights.... (16 hours).

  • Thursday (9/2) we start
  • Friday we install
  • Saturday and Sunday we take data (night)
Changed:
<
<
>
>
Calibrations: when?
Added:
>
>
  • Detectors should be already calibrated.
  • We need time to
    1. Acquire t0s for BM
    2. check that ST relations are fine
    3. Calibrate NaI?
    4. Calibrate LYSO?
 

Where?

Hall 1. Control room 3m out of corridoio (needed to check cables lenght).

  • Cables can exit from experimental hall: to be checked as a function of cable thickness.

GAS

Ar/CO2: it is ok? [needed for both chambers]

Changed:
<
<
>
>
  • We need to bring the bottle
 
  • Cables can exit from experimental hall

Mechanics

  • Rec for electronics?
  • Height from floor: 1.2 m. Are there tables?
Added:
>
>
  1. Lyso + collim
  2. Two Nai at 180 degrees
  3. New Beam Monitor

Hardware

  • New Beam monitor
  • 2 NaI detectors.
 

DAQ

  • Signals from machine?
  • RF or monitoring of position/energy
-- AlessioSarti - 2011-11-16

META FILEATTACHMENT attachment="SKMBT_C36011101011350.pdf" attr="" comment="Sketch of halls and control rooms" date="1321458961" name="SKMBT_C36011101011350.pdf" path="SKMBT_C36011101011350.pdf" size="399519" user="AlessioSarti" version="1"
META FILEATTACHMENT attachment="isocentro1.pdf" attr="" comment="Sketch of halls and control rooms" date="1321458951" name="isocentro1.pdf" path="isocentro1.pdf" size="16118" user="AlessioSarti" version="1"
META FILEATTACHMENT attachment="sezione.pdf" attr="" comment="Sketch of halls and control rooms" date="1321458951" name="sezione.pdf" path="sezione.pdf" size="24753" user="AlessioSarti" version="1"

Revision 12011-11-16 - AlessioSarti

 

CNAO @ Feb 2012


Aim

Target? PMMA (solid water) or Human like phantom?

Particle rates? Up to GHz. We are going to need ~ 1 MHz.

Beam structure. Spill to Spill 3-4 seconds. Spill lasts for 1 second.

Beam Energy: need of a too long PMMA ... now we have 10-22 cm... Beam Spot 0.9 -- 1.1 cm...

TPS?

  1. First night: Take 1 PMMA cylinder and I see what happens varying the angle.Publish fluxes of protons from PMMA. I want to give 1 Gy (treatment like).
  2. Second night: Use a human link phantom.

When?

Februrary 9 -12 ... For 2 nights.... (16 hours).

  • Thursday (9/2) we start
  • Friday we install
  • Saturday and Sunday we take data (night)

Where?

Hall 1. Control room 3m out of corridoio (needed to check cables lenght).

  • Cables can exit from experimental hall: to be checked as a function of cable thickness.

GAS

Ar/CO2: it is ok? [needed for both chambers]

  • Cables can exit from experimental hall

Mechanics

  • Rec for electronics?
  • Height from floor: 1.2 m. Are there tables?

DAQ

  • Signals from machine?
  • RF or monitoring of position/energy
-- AlessioSarti - 2011-11-16

META FILEATTACHMENT attachment="SKMBT_C36011101011350.pdf" attr="" comment="Sketch of halls and control rooms" date="1321458961" name="SKMBT_C36011101011350.pdf" path="SKMBT_C36011101011350.pdf" size="399519" user="AlessioSarti" version="1"
META FILEATTACHMENT attachment="isocentro1.pdf" attr="" comment="Sketch of halls and control rooms" date="1321458951" name="isocentro1.pdf" path="isocentro1.pdf" size="16118" user="AlessioSarti" version="1"
META FILEATTACHMENT attachment="sezione.pdf" attr="" comment="Sketch of halls and control rooms" date="1321458951" name="sezione.pdf" path="sezione.pdf" size="24753" user="AlessioSarti" version="1"
 
This site is powered by the TWiki collaboration platform Powered by PerlCopyright © 2008-2024 by the contributing authors. All material on this collaboration platform is the property of the contributing authors.
Ideas, requests, problems regarding TWiki? Send feedback