CNAO @ Jul 2012Aim
When?July 20 - 22 .
Where?Hall 1. Control room 3m out of corridoio.
GASAr/CO2
Mechanics
| ||||||||
Changed: | ||||||||
< < |
| |||||||
> > |
| |||||||
Hardware
ELOG | ||||||||
Changed: | ||||||||
< < | The elog | |||||||
> > | The elog | |||||||
Night btw 21/22 july.
| ||||||||
Changed: | ||||||||
< < |
| |||||||
> > |
| |||||||
| ||||||||
Changed: | ||||||||
< < | ||||||||
> > | ||||||||
DAQChecked that we can bring our WS1 for daq. There will be an ethernet connection from control room to hall: private network to connect to the WS1, and then we have a wireless to connect to outside. We will use a bridge for the acquisition (either usb or fiber).DAQ config
|
CNAO @ Jul 2012Aim | ||||||||
Changed: | ||||||||
< < |
| |||||||
> > |
| |||||||
Beam structure. Spill to Spill 3-4 seconds. Spill lasts for 1 second. We are going to study that with the scope | ||||||||
Changed: | ||||||||
< < | Beam Energy: need of a too long PMMA ... now we have 10-22 cm... Beam Spot 0.9 -- 1.1 cm... | |||||||
> > | Beam Energy: Computed by simulations (table from G. Battistoni is available) | |||||||
Changed: | ||||||||
< < | TPS that have to be prepared. | |||||||
> > | When? | |||||||
Deleted: | ||||||||
< < |
When? [Draft for time plan] | |||||||
Changed: | ||||||||
< < | Februrary 9 -12 ... For 2 nights.... (16 hours).
| |||||||
> > | July 20 - 22 .
| |||||||
Deleted: | ||||||||
< < |
| |||||||
Where? | ||||||||
Changed: | ||||||||
< < | Hall 1. Control room 3m out of corridoio (needed to check cables lenght). | |||||||
> > | Hall 1. Control room 3m out of corridoio. | |||||||
Changed: | ||||||||
< < |
| |||||||
> > |
| |||||||
Deleted: | ||||||||
< < |
| |||||||
| ||||||||
Deleted: | ||||||||
< < | ||||||||
| ||||||||
Deleted: | ||||||||
< < | ||||||||
GASAr/CO2
Mechanics
Hardware
ELOGThe elog | ||||||||
Added: | ||||||||
> > |
Night btw 21/22 july.
| |||||||
DAQChecked that we can bring our WS1 for daq. There will be an ethernet connection from control room to hall: private network to connect to the WS1, and then we have a wireless to connect to outside. We will use a bridge for the acquisition (either usb or fiber). | ||||||||
Changed: | ||||||||
< < | signals we would like to acquire
| |||||||
> > | DAQ config
| |||||||
|
Changed: | ||||||||
< < | CNAO @ Feb 2012 | |||||||
> > | CNAO @ Jul 2012 | |||||||
Aim
When? [Draft for time plan]Februrary 9 -12 ... For 2 nights.... (16 hours).
Where?Hall 1. Control room 3m out of corridoio (needed to check cables lenght).
GASAr/CO2
Mechanics
Hardware
| ||||||||
Added: | ||||||||
> > | ELOGThe elog | |||||||
DAQChecked that we can bring our WS1 for daq. There will be an ethernet connection from control room to hall: private network to connect to the WS1, and then we have a wireless to connect to outside. We will use a bridge for the acquisition (either usb or fiber).signals we would like to acquire
|
CNAO @ Feb 2012Aim
When? [Draft for time plan]Februrary 9 -12 ... For 2 nights.... (16 hours).
Where?Hall 1. Control room 3m out of corridoio (needed to check cables lenght).
GASAr/CO2
Mechanics
| ||||||||
Added: | ||||||||
> > |
| |||||||
Final setup (Catania like):
Hardware
DAQChecked that we can bring our WS1 for daq. There will be an ethernet connection from control room to hall: private network to connect to the WS1, and then we have a wireless to connect to outside. We will use a bridge for the acquisition (either usb or fiber).signals we would like to acquire
|
CNAO @ Feb 2012Aim
When? [Draft for time plan]Februrary 9 -12 ... For 2 nights.... (16 hours). | ||||||||
Changed: | ||||||||
< < |
| |||||||
> > |
| |||||||
Where?Hall 1. Control room 3m out of corridoio (needed to check cables lenght).
GAS | ||||||||
Changed: | ||||||||
< < | Ar/CO2: it is ok? [needed for both chambers]
| |||||||
> > | Ar/CO2
| |||||||
Mechanics
Hardware
DAQChecked that we can bring our WS1 for daq. There will be an ethernet connection from control room to hall: private network to connect to the WS1, and then we have a wireless to connect to outside. We will use a bridge for the acquisition (either usb or fiber).signals we would like to acquire
|
CNAO @ Feb 2012Aim
| ||||||||
Changed: | ||||||||
< < |
| |||||||
> > |
| |||||||
Beam Energy: need of a too long PMMA ... now we have 10-22 cm... Beam Spot 0.9 -- 1.1 cm... | ||||||||
Changed: | ||||||||
< < | TPS? | |||||||
> > | TPS that have to be prepared. | |||||||
Added: | ||||||||
> > |
| |||||||
| ||||||||
Changed: | ||||||||
< < | When? | |||||||
> > | When? [Draft for time plan] | |||||||
Februrary 9 -12 ... For 2 nights.... (16 hours). | ||||||||
Changed: | ||||||||
< < |
| |||||||
> > |
| |||||||
Added: | ||||||||
> > |
| |||||||
Calibrations: when? | ||||||||
Changed: | ||||||||
< < |
| |||||||
> > |
| |||||||
Where?Hall 1. Control room 3m out of corridoio (needed to check cables lenght). | ||||||||
Changed: | ||||||||
< < |
| |||||||
> > |
| |||||||
Added: | ||||||||
> > |
| |||||||
GASAr/CO2: it is ok? [needed for both chambers] | ||||||||
Changed: | ||||||||
< < |
| |||||||
> > |
| |||||||
Mechanics | ||||||||
Changed: | ||||||||
< < |
| |||||||
> > |
| |||||||
Added: | ||||||||
> > | Final setup (Catania like): | |||||||
Hardware
| ||||||||
Added: | ||||||||
> > |
| |||||||
DAQ | ||||||||
Added: | ||||||||
> > | Checked that we can bring our WS1 for daq. There will be an ethernet connection from control room to hall: private network to connect to the WS1, and then we have a wireless to connect to outside. We will use a bridge for the acquisition (either usb or fiber).
signals we would like to acquire
| |||||||
|
CNAO @ Feb 2012Aim
| ||||||||
Deleted: | ||||||||
< < |
| |||||||
Measurements:
When?Februrary 9 -12 ... For 2 nights.... (16 hours).
| ||||||||
Changed: | ||||||||
< < |
| |||||||
> > |
| |||||||
Where?Hall 1. Control room 3m out of corridoio (needed to check cables lenght).
GASAr/CO2: it is ok? [needed for both chambers]
Mechanics
Hardware
DAQ
|
CNAO @ Feb 2012Aim | ||||||||
Changed: | ||||||||
< < | Target? PMMA (solid water) or Human like phantom? | |||||||
> > |
| |||||||
Deleted: | ||||||||
< < | Particle rates? Up to GHz. We are going to need ~ 1 MHz. | |||||||
Beam structure. Spill to Spill 3-4 seconds. Spill lasts for 1 second. Beam Energy: need of a too long PMMA ... now we have 10-22 cm... Beam Spot 0.9 -- 1.1 cm... TPS? | ||||||||
Deleted: | ||||||||
< < | ||||||||
| ||||||||
Added: | ||||||||
> > | Measurements:
| |||||||
When?Februrary 9 -12 ... For 2 nights.... (16 hours).
| ||||||||
Changed: | ||||||||
< < | ||||||||
> > | Calibrations: when? | |||||||
Added: | ||||||||
> > |
| |||||||
Where?Hall 1. Control room 3m out of corridoio (needed to check cables lenght).
GASAr/CO2: it is ok? [needed for both chambers] | ||||||||
Changed: | ||||||||
< < | ||||||||
> > |
| |||||||
Mechanics
| ||||||||
Added: | ||||||||
> > |
Hardware
| |||||||
DAQ
|
CNAO @ Feb 2012AimTarget? PMMA (solid water) or Human like phantom? Particle rates? Up to GHz. We are going to need ~ 1 MHz. Beam structure. Spill to Spill 3-4 seconds. Spill lasts for 1 second. Beam Energy: need of a too long PMMA ... now we have 10-22 cm... Beam Spot 0.9 -- 1.1 cm... TPS?
When?Februrary 9 -12 ... For 2 nights.... (16 hours).
Where?Hall 1. Control room 3m out of corridoio (needed to check cables lenght).
GASAr/CO2: it is ok? [needed for both chambers]
Mechanics
DAQ
|